I. Installation and Operating Precautions
To ensure safety and prevent possible damage to the rework station, it is required to install
the rework station at a location complying with the following conditions.
◆ Away from inflammables.
◆ Free from splashing of water or other liquids.
◆ Free from the direct airflow impact from air conditioner, heater or ventilator.
◆ With good ventilation, dry location, free from excessive dust.
◆ Free from vibration or shock, at a stable and flat location.
Power Supply
Power and voltage should meet the following requirements:
◆ Use the power supply with little voltage fluctuation
Voltage fluctuation: AC220V±10%。
Frequency fluctuation: 50/60Hz±0. 3%
Space Requirements
To facilitate operation, component replacement and maintenance for the rework station,
it is required to reserve >300mm space at the back of the rework station.
Download list
R600manual.pdf
1.7 MB · Views: 54
1.7 MB · Views: 54
R600 Spec Sheet.pdf
283 KB · Views: 39
283 KB · Views: 39